Malawi Government Gazette dated 2015-07-17 number 35

NOT AVAILABLE FOR LOAN

THE MALAWI GOVERNMENT GAZETTE
{Published by Authority)
3,285: Vo). LII No. 35] Zomba, 17th July, 2015

Registered at the G.P.O. as a Newspaper Price: K250.00

CONTENTS Page The line comes out of the Area 48 Substation into Area 47 and then
crosses the Area 18-Area 49B Gulliver Road to reach Area 18B running
Electricity Supply Corporation of Malawi—Notification of
Intetion to Erect Power Transmission Lines . . 391-392 parallel to the Nankhaka Stream on the eastern side, passing through Area
30 and Kanengo Factory in Area 28. It proceeds further to cross the railway
Office of the President and Cabinet—Notice of Approval to
Change Name . . 393 line to the eastern side of Ngona Village of T/A Chitukula and lands into
Lilongwe B Substation at Kanengo.

General Notice No. 66 From Lilongwe B Substation, the line moves eastern wards to cross
the Lilongwe-Mzuzu Ml Road where it turns at a 90° angle and goes south
ELECTRICITY SUPPLY CORPORATION OF MALAWI LIMITED wards (towards Lilongwe City) in parallel with the Ml Road and turns east
into Area 43 Extension. It crosses Namisikidzi Stream and lands into
ELECTRICITY ACT NO. 22 OF 2004 Kauma Substation.

Notification of intetion to Erect Power Transmission Lines The line goes out of Kauma Substation and moves south wards in

(Old Town-Area 48-Kanengo-Kauma-Kamuzu Barracks) parallel with, and to the west of the existing 66kV wooden pole line
passing through Kauma Village and crosses Kauma River. It proceeds into
Area 12 and crosses the City Centre-Presidential Drive Road into Area 34
In accordance with section 39 of the Electricity Act, (No. 22 of 2004)
to the east of the Presidential Villa. It moves further to cross the Lilongwe
notice is hereby given that Electricity Supply Corporation of Malawi
River before it finally lands into Lilongwe C Substation at Kamuzu
Limited (hereinafter called “the Corporation”) intends to erect an overhead
Barracks.
power transmission line (hereinafter called “the Line”) from LL A
Substation at Old Town Power Station to Kamuzu Barracks via Area 48, Any owner, lessee, or occupier over whose land the intended
Kanengo and Kauma Substations in Lilongwe. transmission lines passes, is informed that plans for construction are
available for inspection at the Corporation’s Office at Umoyo House in
1. Particulars of the line are as follows— Blantyre, Magetsi House in Lilongwe and ESCOM Regional Office in
Length 30,543 meters Mzuzu. Route plans can also be inspected at Millennium Challenge

Wayleave width 30 metres (15 m either side) Account-Malawi Offices at Pamodzi House in Lilongwe and the Lilongwe
City Council at any time during normal business days (Monday to Friday)
Voltage ’ 66,000 Volts
from 07.30 a.m. to 4.30 p.m.

Notice is further given that objections by any owner, lessee or
Description
occupier of land affected by the intended transmission line must be served
The line shall be of single circuit delta construction of three phase on the Corporation in writing within 30 days from the date hereof at the
wire from Lilongwe A Substation to Kamuzu Barracks Substation. Type of offices of the Corporation.
conductor used shall be stranded Parakeet (ACSR) housing a nominal cross
section area of 282 square millimeters. The type of earth wire will be a 48 Dated this 18th day of June, 2015.

core optic fibre ground wire (OPGW). The line will be constructed on
monopole steel structures from Lilongwe A Substation (at Old Town) to Everson B. Sitolo
Area 48 Substation and the rest will be constructed on steel lattice towers Director of Corporate Services and Company Secretary
i.
e. from Area 48 Substation to Lilongwe B Substation (at Kanengo) to Electricity Supply Corporation ofMalawi Limited
Kauma Substation up to Lilongwe C Substation (at Kamuzu Barracks).

General Notice No. 67
2. The Proposed line route shall be as follows—

ELECTRICITY SUPPLY CORPORATION OF MALAWI LIMITED
The Lilongwe Ring power line starts from Lilongwe A Substation at
Old Town going to the west side of existing 66 kV Nkula-Lilongwe line ELECTRICITY ACT NO. 22 OF 2004
and passing to the east of Lilongwe Golf Club. It crosses Lilongwe River
Notification of intetion to Erect Power Transmission Lines
into Katete Farm where it makes almost a 60° angle and heads southwards
(Telegraph Hill-Katoto-Sonda-Luwinga)
where it crosses the Western Bypass Main Road. The line runs in parallel
of the Western Bypass Road and crosses Lilongwe River, the Likuni Road
In accordance with Section 39 of the Electricity' Act, (No. 22 of 2004)
and Mchinji Road near the Lilongwe-Mchinji Roundabout and the MRA
notice is hereby given that Electricity Supply Corporation of Malawi
Complex Offices up to Area 47 Njewa on the west of Kaunda Road. It goes
Limited (hereinafter called “the Corporation”) intends to erect an overhead
further passing through the Police Compound Houses and Ntandire where
power transmission line (hereinafter called “the Line”) from Telegraph Hill
it crosses the road running to the west of the existing 66kV wooden pole
Substation at Nsongwa area to Luwinga Substation via Katoto and Sonda
line and lands into Area 48 Substation. Substations in Mzuzu.